Commit Graph

5 Commits

Author SHA1 Message Date
de0192fa30 'eg.' should be 'e.g.'
Signed-off-by: YuPengZTE <yu.peng36@zte.com.cn>
Upstream-commit: 0b86bca0b5c627ebb9524ecf5295c2c91e4bd8f5
Component: engine
2016-09-21 13:48:06 +08:00
cecd3ec1b9 Move some test fixtures to go
moves ensure-frozen-images to go
moves ensure-syscall-test to go
moves ensure-nnp-test to go
moves ensure-httpserver to go

Also makes some of the fixtures load only for the required tests.
This makes sure that fixtures that won't be needed for a test run such as
`make TESTFLAGS='-check.f Swarm' test-integration-cli` (for example)
aren't loaded... like the syscall tests.

Signed-off-by: Brian Goff <cpuguy83@gmail.com>
Upstream-commit: ff91276d1f5beab5582d9ca582ee01af13198333
Component: engine
2016-09-07 17:30:35 -04:00
b03700a5d5 Verify integration tests before building bundles
Adds a new bundle `verify-integration-tests` which pre-compiles a test
binary for the integration tests.

This makes sure that the integration tests will actually compile before
doing other tasks which take much longer, such as building dockerd and
loading test fixtures.
When it comes time to actually run the tests, the pre-compiled binary
will be used so it doesn't have to compile the tests a 2nd time.

Signed-off-by: Brian Goff <cpuguy83@gmail.com>
Upstream-commit: 4d0275c8192ca39d88f7dbe1e59ec03b544b6696
Component: engine
2016-09-06 20:27:28 -04:00
75edb24b6f Disable coverage on test-integration-cli
Temporarly remove cover bundle from defaults.

Signed-off-by: Vincent Demeester <vincent@sbr.pm>
Upstream-commit: 5ec6e11e157b94d56bc2d7aa8e94cf7e72f51871
Component: engine
2016-08-18 22:12:24 +02:00
aa2e0abc3e Support interactive integration testing.
Interactive integration testing is useful when you're developing new tests, or
making changes to cli code.

Signed-off-by: Daniel Nephin <dnephin@docker.com>
Upstream-commit: 1d945a9743748373cd5c5bfface3209d241007d7
Component: engine
2016-08-05 12:07:28 -04:00