Commit Graph

3 Commits

Author SHA1 Message Date
c2c6cea1b0 Clean some integration-cli/fixtures package/files
- Move go package used by both `integration-cli` and `integration` to
  `internal/test/fixtures`.
- Remove fixtures that are not used anymore (moved to `docker/cli` a
  while ago) : deploy, notary, secrets.

Signed-off-by: Vincent Demeester <vincent@sbr.pm>
Upstream-commit: 5f56503f583f21d655394f755f71849381bd58c7
Component: engine
2018-04-16 10:48:58 +02:00
d36e75fc44 integration/*: make e2e run without failure
… mainly by skipping if daemon is remote.

Signed-off-by: Vincent Demeester <vincent@sbr.pm>
Upstream-commit: 6016e79d2552b21643f4bfd093ce76d8ef956d79
Component: engine
2018-03-19 09:47:17 +01:00
b4446f4926 Move log validator logic after plugins are loaded
This ensures that all log plugins are registered when the log validator
is run.

Signed-off-by: Brian Goff <cpuguy83@gmail.com>
Upstream-commit: b0b9a25e7e60abbe143e149ccaaf4dfb62044016
Component: engine
2018-02-15 11:53:11 -05:00