A member can end up paying for a tier below one they were granted, with the granted tier waiting behind it #159
Open
opened 2026-10-01 07:26:48 +00:00 by cgalo5758
·
2 comments
Labels
Clear labels
accessibility
area/billing
area/catalog
area/discourse
area/domains
area/entitlements
area/fedwiki
area/identity
area/integrations
area/licensing
area/member-ui
area/meta
area/operator-ui
area/ops
area/testing
duplicate
good-first-issue
invalid
privacy
security
upstream
wontfix
A barrier for people using assistive technology or a keyboard alone.
The Stripe mirror, checkout, subscriptions, invoices, fulfillment.
Products, prices, plan ladders, purchasability.
The Discourse integration.
The domains registry, claims, placements, the certificate ask.
Entitlement sets, rules, grants, pools, provisioning.
The Federated Wiki integration and farm sync.
Sign-in, sessions, persons, organizations, workspaces, roles.
The provider registry, outbox and webhooks in general.
Licenses, the contributor agreement, SPDX headers.
Member pages.
The repository itself, its contributing guide, CI, the tracker and the workflow.
Operator pages, forms, lists, the design system.
Deployment, configuration, migrations, workflows, instance settings.
The test stack, screens, lint, walkthroughs.
Closed because another issue already covers it.
Small, self-contained, and explained enough to be a first contribution.
Closed because it is not a ticket for this repository.
Touches what a person's data reveals.
Touches authentication, authorization, secrets or data exposure.
Waits on another repository or project before it can move.
Closed because it will not be done, with the reason in the last comment.
kind
bug
The software does something other than what it promises; closed when it again does what it promises.
kind
debt
Code, tests or tooling to clean up with nothing visible changing; closed when they are cleaner.
kind
design
A question to settle before work can be defined; closed when the decision is written down.
kind
docs
Documentation that is wrong or missing; closed when it says the right thing.
kind
enhancement
Something the software does not do yet; closed when it does.
priority
critical
Blocks the active milestone or harms members now.
priority
high
Next in line inside the active milestone.
priority
low
Inside the active milestone, when nothing else is left.
priority
medium
Inside the active milestone, after the high ones.
Milestone
No items
No Milestone
Projects
Clear projects
No projects
No Assignees
Notifications
Due Date
No due date set.
Dependencies
No dependencies set.
Reference: wiki-cafe/member-console#159
Reference in New Issue
Block a user
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
The question
An operator can mark a grant so that it delivers again when the plan that replaced it ends. One sequence leaves a member paying for less than they were given. Take one ladder, Starter → Plus → Pro → Max:
The member now pays for Plus while a free Pro waits above it. Pro comes back only if the member cancels Plus. The other way into the same state is an edit to the subscription's price made directly at the payment provider, which moves it below a marked grant's tier while the grant waits.
What the console does today
docs/plan-management.md.Why it can happen
Three rules combine; the first comment explains why a grant waits:
Options known so far
Decided when
Which of these applies is decided and written down. The member's Products page and the operator's grant row both say what happens next in this state, and a test drives the five steps above.
To revisit: "a grant waits for the subscription's full end, not a change of tier". I want to reconsider this rule, so here is why it was chosen. It is really two rules.
1. A change of tier inside the ladder never resumes the grant. This one is structural, not chosen. A ladder holds one source at a time, and resumption never takes a rung from another source. A subscription that moves from Max to Plus still holds the ladder's rung, so there is no vacant rung for Pro to return to. Resuming Pro anyway would mean taking the rung from a plan the member is still paying for. They would then be billed for a subscription that delivers nothing on that ladder. Changing this rule means deciding what happens to the subscription at that moment: cancel it, refund it, or let it keep billing for nothing.
2. A subscription that leaves the grant's ladder but keeps running does not resume the grant until it ends. This was a real choice. It covers an edit at the payment provider that moves the subscription's item to another ladder, or removes the item, while other items keep billing. The reasons:
What #159 adds to that picture. The case here comes from rule 1 combined with a third rule: the console never rewrites a downgrade the member already scheduled. Rule 2 is not involved. So revisiting "waits for the full end" for this case means revisiting rule 1, which in turn means choosing what happens to the subscription. The options in the issue body are the candidates.
Checkout is a third way into this state: it lets an organization on a granted tier buy a tier below it, and the purchase replaces the grant. #175 makes Checkout refuse that purchase.